After nearly four decades of development, our company has formed a management and technology development system and a stable market, taking the leading position in the same industry. At the same time, our company is vigorously promoting the "environmental protection housekeeper" concept to provide environmental protection problem management services with all-round, 24 hours one day, 365 days per year in the enterprise life cycle and form a close community with servicing enterprises.
My company will become an environmental protection company with good economic efficiency, rich sense of social responsibility, and respected by the society and make a modest contribution to make the earth more green, the sky more blue, the river clearer to achieve the beautiful Chinese dream!
Tianhe Corporation has the class A qualification certificate of environmental impact assessment of construction project issued by the Ministry of Environmental Protection (EIA 4004th). The existing evaluation scope includes: Environmental Impact Report Category: Class A - Building Materials Thermal Power, Mining, and Transportation, a total of three categories; Class B, light industry and textile chemical fiber, Metallurgical electromechanical, Chemical petrochemical and pharmaceutical, a total of three categories, as well as the general project environmental impact report form.
In addition, the company's business scope also includes environmental protection completion acceptance, environmental supervision, environmental pollution design and third-party governance, environmental protection research, implementation plan compilation of control of pollutant discharge permit system, environmental protection planning and compilation of planning EIA, environmental emergency plan, clean production audit, energy audit, polluted site repair, environmental risk assessment, environmental comprehensive treatment, environmental management housekeeper, and so on. At present, there are 38 employees in total in the company, including 18 registered environmental impact assessment engineers.
Environmental impact assessment services
Environmental protection facilities design consulting services
Environmental protection acceptance services
Environmental supervision project
Environmental verification
Environmental emergency preparedness plan
Annual environmental report compilation
Technical advisory services of environmental facilities operation
Clean production audit
Intelligent environment
Karamay national economic and social development strategic planning;
Xinjiang Uygur Autonomous Region textile industry “The 12th Five-Year Plan”;
Xinjiang Uygur Autonomous Region nonferrous metal industry “The 12th Five-Year Plan”;
Xinjiang power grid “The 12th Five-Year Plan” environmental impact report;
Xinjiang Uygur Autonomous Region salt industry “The 12th Five-Year Plan”;
Xinjiang Uygur Autonomous Region gold industry “The 12th Five-Year Plan”;
National economic and social development "thirteenth five-year" strategic planning in Yili Prefecture, Tacheng Prefecture, Aksu Prefecture, Altay Prefecture;
Kashi Prefecture "thirteenth five-year" major pollutant total control plan, air pollution prevention planning, noise pollution prevention planning, nuclear and radiation safety planning, rural environmental protection comprehensive planning;
"Kuitun-Dushanzi Economic and Technological Development Zone Master Plan (2012-2030)".
Dabei block ground construction project of Krasu gas field of Tarim Oilfield Branch;
Keshen area two ground construction project of Krasu gas field of Tarim Oilfield Branch;
Akemomu gas field development and construction projects of PetroChina Co Ltd. Tarim Oilfield Branch;
Construction project of Lianhuo National Highway G30 section from Turpan to Xiaocaohu;
Highway engineering of G314 line section from Baokuduke to Yuergun;
Reconstruction and expansion project of G7 from Dahuangshan to Urumqi;
Self-contained thermal power station expansion project of potash fertilizer project energy expansion project of SDIC Xinjiang Luobupo Hoevellite Co., Ltd with 1.2 million tons product per year;
Power Plant 4 × 660MW project in Xinjiang Zhundong Wucai Bay North 3 of Huaneng Xinjiang Energy Development Co., Ltd., and State Grid Zhundong Coal Chemical Co., Ltd.
Centralized water source environmental protection planning in Kashi City;
Water pollution control planning of Wuqia Xian Environmental Protection Bureau;
The overall implementation plan of ecological protection of Kizilsu River;
Overall implementation plan of ecological environment protection, ecological environment protection plan and ecological security assessment report of Barkol Lake;
Safety Management of Natural Gas Treatment Station in Oil Production Plant One;
Energy saving and comprehensive utilization of methanol gas of Tianshan Mountains environmental protection Kuche Dimethyl Ether Co., Ltd.
Water Source Protection Project in Artux City of Atushikang Spring Water Supply and Drainage Co., Ltd.
Project Environmental Supervision of Karamay Hazardous Waste Comprehensive Disposal Demonstration Center
Urumqi Urban Transport Improvement Project (Phase II) with World Bank Loan: Environmental Protection Implementation;
Development of Xinjiang Vocational Education Project with World Bank Loan: Environmental management plan implementation and monitoring;
Existing Urumqi public buildings energy saving and reconstruction project with European Investment Bank loans: implementation and monitoring of management plan;
Urumqi Central Heating and Energy Saving Project: implementation and monitoring of environmental management.
Investigation report of construction project completion and environmental protection acceptance of Luliang Oilfield Lu 9 well area 2014 annual capacity of PetroChina Co Ltd. Xinjiang Oilfield Branch;
Investigation report of completion and environmental protection acceptance of Dishuiquan Oilfield well area No. 20 construction project of PetroChina Co Ltd. Xinjiang Oilfield Branch;
Investigation report of construction project completion and environmental protection acceptance of provincial highway 321 line from Huoshao Bridge to Erbin Mountain;
Investigation report of engineering completion and environmental protection acceptance of Qiemo transit section of National Highway 315 line;
Investigation report of engineering completion and environmental protection acceptance of Provincial Highway 205 to Highway 304 Connection Highway;
Investigation report of engineering completion and environmental protection acceptance of supporting power station project in Alagou Reservoir, Tuokexun County, Xinjiang;
Investigation report of engineering completion and environmental protection acceptance of Taisimusi Hydropower Station on Akeyazi River in Yili, Xinjiang
Address: No.215, Nanhu West Road, Shuimogou District, Urumqi City, Xinjiang.
TEL:0991-3857017、0991-3662317
FAX:0991-3857017